INNOVATIVE CONSTRUCTION MANAGEMENT
Домой

Mir Instrumenta (World of Tools)


Construction of an “A” Class Production and Warehouse Site for
Construction Materials Storage

total floor area over  13,000 sqm, located in Moscow region

 

 

 

 
The construction of the warehouse was carried out concomitantly with the complete reviewing and corresponding duly re-approval of the entire Client’s project documentation. According to the Client’s technicians requirements the columns span was increased from 6x12 m up to 12x24 m, while the warehouse height was augmented up to 15.5 m in the ridge (12 m to the trusses bottom). For this project we developed the special technical requirements approved by EMERCOM of Russia and providing all the necessary fire prevention measures for future safety operation of the warehouse and offices. The warehouse is equipped of compete set of 18 gates, loading bridges and sealed doors supplied by Hoermann Company. The total construction term was 12 months starting the entering the development. 
 

2016 © ICM. INNOVATIVE CONSTRUCTION MANAGEMENT
(design, construction, reconstruction and renovation)
All rights reserved
phone / fax: +7 495 234 41 25
mailing address:
bld. 2, 13 Yasnogorskaya st., Moscow, Russia (see the map)
e-mail: mail@icm-net.ru